/

CIMC's representative in Iceland

/

CIMC's representative in Iceland

/

CIMC's representative in Iceland

Crafting

Crafting

sustainable

sustainable

Crafting

sustainable

modular spaces

modular spaces

& modular
spaces

/

What we do

/

What we do

/

What we do

With the CIMC units, you get

With the CIMC units, you get

With the CIMC units you get

faster construction time

faster construction time

exceptional quality

exceptional quality

exceptional quality

for a better price and a

for a better price and a

for a better price and a

faster construction time

/

In more detail

/

In more detail

/

In more detail

What is
CIMC?

What is
CIMC?

What is CIMC?

Asembla is a distribution agent for CIMC-MBS in Iceland. CIMC is the largest manufacturers of shipping containers in the world. In 2004, CIMC started a production of the modular building system (MBS) and has been successfull for over 20 years later. With more than 45,000 modules installed around the world.

/

Businesses that use CIMC units

/

Businesses that use CIMC units

/

Businesses that use CIMC units

/

Why CIMC?

/

Why CIMC?

/

Why CIMC?

Why choose
CIMC modules?

Why choose
CIMC modules?

Why choose
CIMC modules?

Our priority is quality and stability during the production process, which delivers a high-quality product. The units have multiple benefits, including: 

44%

Less construction waste

22%

Lower construction cost

51%

Shorter construction time

Would you like a introductory meeting?

Would you like a introductory meeting?

Would you like a introductory meeting?

Main advantages of
CIMC building modules

Your design

/

/

Your design

Your design

/

The modules can be up to 5 x 16m (80 square meters) in size and arranged according to your own design and with materials of your choice.

Shorter construction time

/

/

Shorter construction time

It is possible to install up to 20 units per day and there are examples of construction time being shortened by 6 months.

Shorter construction time

/

It is possible to install up to 20 units per day and there are examples of construction time being shortened by 6 months.

Sound-proof

/

/

Sound-proof

The modules meet strict requirements for acoustics and are therefore a popular choice for hotel constructions.

Sound-proof

/

The modules meet strict requirements for acoustics and are therefore a popular choice for hotel constructions.

Low maintenance

/

/

Low maintenance

Low maintenance

/

The modules are low-maintenance, and are insulated and cladded on the outside, which reduces the likelihood of fungal growth.

Known materials

/

/

Known materials

Only CE certified building materials are used. The emphasis is on selecting building materials that are common in Iceland, so it is easy to get spare parts.

Known materials

/

Only CE certified building materials are used. The emphasis is on selecting building materials that are common in Iceland, so it is easy to get spare parts.

Ready-made

/

Ready-made

/

The modules come fully furnished according to your own choice of furniture, decor, cabinets, bathrooms, etc., depending on your needs.

Ready-made

/

The units can come fully furnished according to your own choice of furniture, decor, cabinets, bathrooms, etc., depending on your needs.

/

Projects

/

Projects

/

Projects

Projects built with
CIMC modules

Projects built with
CIMC modules

Projects built with
CIMC modules

CIMC modules have been used in the construction of hotels, employee dormitories, student apartments, work camps, hospitals and more around the world. Here are examples of selected projects that have utilized CIMC modules.

/

The process

/

The process

/

The process

How does it work?

Get ready-made modules with interiors and furniture. The whole process takes eight to twelve months, depending on the project size.

View video

View video

View video

01 / 09

Viability assessment

The buyer answers questions regarding the project. The answers help evaluate whether the CIMC solution is suitable for the project.

01 / 09

Viability assessment

The buyer answers questions regarding the project. The answers help evaluate whether the CIMC solution is suitable for the project.

01 / 09

Viability assessment

The buyer answers questions regarding the project. The answers help evaluate whether the CIMC solution is suitable for the project.

02 / 09

Requirement analysis

The design documents are reviewed and assessed on how to achieve maximum efficiency from the modules.

02 / 09

Requirement analysis

The design documents are reviewed and assessed on how to achieve maximum efficiency from the modules.

02 / 09

Requirement analysis

The design documents are reviewed and assessed on how to achieve maximum efficiency from the modules.

03 / 09

Rough price estimate

After reviewing the drawings, a rough price estimate for the units that have arrived in the country is provided. If the buyer agrees with the price, a cooperation agreement is signed that leads to a contract once the final price offer is available.

03 / 09

Rough price estimate

After reviewing the drawings, a rough price estimate for the units that have arrived in the country is provided. If the buyer agrees with the price, a cooperation agreement is signed that leads to a contract once the final price offer is available.

03 / 09

Rough price estimate

After reviewing the drawings, a rough price estimate for the units that have arrived in the country is provided. If the buyer agrees with the price, a cooperation agreement is signed that leads to a contract once the final price offer is available.

04 / 09

Project definition

Final drawings are worked on with the buyers' design team and the CIMC design team

04 / 09

Project definition

Final drawings are worked on with the buyers' design team and the CIMC design team

04 / 09

Project definition

Final drawings are worked on with the buyers' design team and the CIMC design team

05 / 09

Design freeze

When the final drawings are ready, a design freeze is put on the project. At this stage, sufficient information is available for CIMC to provide a fixed price quote for the modules and a contract for the modules is signed.

05 / 09

Design freeze

When the final drawings are ready, a design freeze is put on the project. At this stage, sufficient information is available for CIMC to provide a fixed price quote for the modules and a contract for the modules is signed.

05 / 09

Design freeze

When the final drawings are ready, a design freeze is put on the project. At this stage, sufficient information is available for CIMC to provide a fixed price quote for the modules and a contract for the modules is signed.

06 / 09

Production

CIMC starts material procurement, prepares and constructs the modules in the factory in China. Everything is carried out in accordance with the drawings and technical documents of the Icelandic designers.

06 / 09

Production

CIMC starts material procurement, prepares and constructs the modules in the factory in China. Everything is carried out in accordance with the drawings and technical documents of the Icelandic designers.

06 / 09

Production

CIMC starts material procurement, prepares and constructs the modules in the factory in China. Everything is carried out in accordance with the drawings and technical documents of the Icelandic designers.

07 / 09

On-site preperation

While the production is ongoing, the buyer must ensure that the site is ready to receive the modules. This applies to plumbing, concrete work, electrical installations, etc.

07 / 09

On-site preperation

While the production is ongoing, the buyer must ensure that the site is ready to receive the modules. This applies to plumbing, concrete work, electrical installations, etc.

07 / 09

On-site preperation

While the production is ongoing, the buyer must ensure that the site is ready to receive the modules. This applies to plumbing, concrete work, electrical installations, etc.

08 / 09

Instalment

The modules arrive by sea to the country and are delivered at the dock. The modules need to be transported to the site and assembled (cost to the contractor).

08 / 09

Instalment

The modules arrive by sea to the country and are delivered at the dock. The modules need to be transported to the site and assembled (cost to the contractor).

08 / 09

Instalment

The modules arrive by sea to the country and are delivered at the dock. The modules need to be transported to the site and assembled (cost to the contractor).

09 / 09

Follow-up

It is ensured that CIMC has fulfilled the terms of the contract. The modules are reviewed and it is ensured that they comply with the drawings, and improvements are made if problems or defects arise.

09 / 09

Follow-up

It is ensured that CIMC has fulfilled the terms of the contract. The modules are reviewed and it is ensured that they comply with the drawings, and improvements are made if problems or defects arise.

09 / 09

Follow-up

It is ensured that CIMC has fulfilled the terms of the contract. The modules are reviewed and it is ensured that they comply with the drawings, and improvements are made if problems or defects arise.

/

The team

/

The team

/

The team

Andri Björgvin Arnþórsson

Sales and marketing

andri@asembla.is

Andri Björgvin Arnþórsson

Sales and marketing

andri@asembla.is

Andri Björgvin Arnþórsson

Sales and marketing

andri@asembla.is

Íris Brá Svavarsdóttir

Finances

iris@asembla.is

Íris Brá Svavarsdóttir

Finances

iris@asembla.is

Íris Brá Svavarsdóttir

Finances

iris@asembla.is

Svavar Kristinsson

CEO

svavar@asembla.is

Svavar Kristinsson

CEO

svavar@asembla.is

Svavar Kristinsson

CEO

svavar@asembla.is

Contact us

hallo@asembla.is

hallo@asembla.is

hallo@asembla.is

/

Authorized agent of CIMC in Iceland

/

Links

/

Links

/

Other

/

Other

Other

/

Other

/

Kt: 460323 - 0100

Austurmörk 7, 810 Hveragerði